Cheltenham & a 20-mile radius

Access for your new windows.

Replacing windows above ground level? Tell us which parts of the building need access and what your window fitters have planned.

Scaffolding on both sides of a rendered building for window replacement
Window replacement scaffolding, as described by Warren.

Plan around the fitting work.

A few windows on one elevation and a building-wide replacement can call for different access arrangements. Start with the number of floors involved, the sides of the building and the requirements of your fitters.

If the property will be occupied during the work, mention entrances, shared paths and any access that needs to remain in use. These are useful details for the initial conversation, alongside the fitting schedule.

Before the work begins.

A few details help us understand the job.

The elevations involved

Explain where the windows are being replaced and whether work is happening on several sides of the building or in stages.

Working around the property

Mention porches, extensions, gardens and shared access. Your fitters’ requirements and the property layout need to be considered together.

Fitting and finishing

Allow for the work you actually expect your trades to complete, including any planned making-good. Discuss hire and removal when agreeing the scope.

Discuss your project

A few things
you might be asking.

Still have a question?
Talk it through with Max Scaffolding.

Give us a call
Do I need scaffolding for every window replacement?

The access method depends on the building and the work. Discuss the requirements with your window installer, then contact Max Scaffolding about the scaffold access they need.

Can the work be done in phases?

Tell us which parts of the building will be worked on and in what order. Any phasing or alterations need to be included in the discussion and agreed scope.

Can people still use the entrance?

Flag entrances and shared access at the start. Arrangements are site-specific, so do not assume access will be unchanged without discussing the proposed setup.

Let’s get your
project started.

Talk your plans through with Warren. Call Max Scaffolding to discuss the work and get a free quote.

07495 870531

Can’t talk right now?

Send your details with the form and we’ll get back to you with a free quote.

Cheltenham & a 20-mile radius

We use your details to reply to your enquiry. Read our privacy policy.